1 - Achieving requirements of Missan refinery with a capacity of 30 thousand barrels / day .
2 - Achieving the connecting of pipeline for network for the new steam boilers .
3 - Constructing of administrative building Department of Energy , Department of Electrical maintenance building , and the extension of the first refining unit .
4 - Constructing a power station inside stores department.
5 - Constructing of three tanks in the Basra refinery capacity ( 10,000 m3 )
6 - Constructing three tanks in the refinery different sizes.
7 - Constructing of heat exchangers number 32 variant types .
8 –Constructing of extending of drinkable water pipe to Shatt al- Basra .
9 - Reconstructing of treatment unit of boiler water at the Department of Energy .