1 - Achieving requirements of Missan refinery with a capacity of 30 thousand barrels / day .

2 - Achieving the connecting  of pipeline for network for the new steam boilers .

3 - Constructing of  administrative building Department of Energy , Department of Electrical maintenance building , and the extension of the first refining unit .


4 - Constructing a power station inside stores department.


5 - Constructing  of three tanks in the Basra refinery capacity ( 10,000 m3 )


6 - Constructing  three tanks in the refinery different  sizes.


7 - Constructing  of heat exchangers number 32 variant types .


8 –Constructing  of  extending of drinkable water pipe  to Shatt al- Basra .


9 - Reconstructing of treatment unit of  boiler water at the Department of Energy .